R.B. Morris, Y. Tsuji, et al.
International Journal for Numerical Methods in Engineering
We consider the High-Multiplicity Cyclic Job Shop Scheduling Problem. There are two objectives of interest: the cycle time and the flow time. We give several approximation algorithms after showing that a very restricted case is APX-hard. © 2008 Elsevier B.V. All rights reserved.
R.B. Morris, Y. Tsuji, et al.
International Journal for Numerical Methods in Engineering
J.P. Locquet, J. Perret, et al.
SPIE Optical Science, Engineering, and Instrumentation 1998
Amir Ali Ahmadi, Raphaël M. Jungers, et al.
SICON
W.C. Tang, H. Rosen, et al.
SPIE Optics, Electro-Optics, and Laser Applications in Science and Engineering 1991