Fan Zhang, Junwei Cao, et al.
IEEE TETC
In this paper, we study polynomial time approximation schemes (PTASes) for the no-wait job shop scheduling problem with the makespan objective function. It is known that the problem is MaxSNP-hard in the case when each job is allowed to have three operations or more. We show that if each job has at most two operations, the problem admits a PTAS if the number of machines is a constant (i.e., not part of the input). If the number of machines is not a constant, we show that the problem is hard to approximate within a factor better than 5/4. © 2005 INFORMS.
Fan Zhang, Junwei Cao, et al.
IEEE TETC
Raymond Wu, Jie Lu
ITA Conference 2007
Preeti Malakar, Thomas George, et al.
SC 2012
Yigal Hoffner, Simon Field, et al.
EDOC 2004